1. Set the goal: what will you monitor, and why?
Energy monitoring is set up for a purpose: seeing consumption by line, machine or department, spotting loads that run idle, seeing maintenance needs early, or allocating energy costs to production units. The goal determines how many points are measured and how much detail the data needs.
Instead of “let's measure everything”, start with the questions you want answered: Which line or department uses the most energy? Which loads keep running when there is no production? Does a machine's consumption change over time? Write down who will use the data as well; production, maintenance and finance teams need different reports.
2. Survey the site
Planning starts with an on-site survey of the facility. The survey records:
- The electrical distribution layout, the panels, the free space in them and any existing meters.
- Cable routes and the paths available for new cables.
- The existing network infrastructure, racks and the condition of network devices.
- Whether the machines can share their own data.
- Site conditions such as dust, humidity, temperature and vibration, which affect device selection and protection.
If the facility's electrical drawings and diagrams are out of date, updating them alongside the survey makes everything that follows easier.
3. Prepare the electrical infrastructure for monitoring
Measurements are usually taken in the panels: at the main incomer, the distribution panels and the circuits feeding large loads. Space should be reserved in the panels for meters and their connections, and spare capacity left for new machines. Panel and circuit labels should match what is actually on site; the names in the monitoring system come from these labels.
Electrical work should be carried out by authorized, qualified personnel in line with the applicable regulations and standards. Safety measures during the work, such as isolating, locking out and tagging, should be written into the work plan from the start.
4. Design the network around production and office needs
Data from meters and sensors needs a reliable network to travel on. Structured cabling, racks, network switches and, where needed, wireless coverage are planned together.
- Setting up the production network and the office network as separate segments makes security and management easier.
- Metal structures and machinery can affect wireless signals; wired connections should be preferred at critical points that send data continuously.
- Racks should have uninterruptible power, adequate cooling and consistent labeling.
- If security cameras will share the same infrastructure, network capacity and recording storage should be sized accordingly.
5. Design data collection and the monitoring system
Decide which data will be collected: energy consumption, current, voltage and power readings, machine running status or measurements such as temperature. Then answer these questions:
- How often will data be collected, where will it be stored and for how long?
- Who will see what in the dashboards and reports, and how will permissions be split?
- Which conditions will trigger an alert, and who will receive it?
- What will prevent data loss if the network connection drops?
Clear reports matter as much as the installation itself. Using the same line, machine and department names as the labels on site ensures the data is read correctly.
6. Plan the installation to disrupt production as little as possible
In a running facility, work that needs a power cut should be scheduled around planned shutdowns, maintenance days or shift changes. Splitting the work into phases reduces risk: starting with one line or department shows early on whether the reports meet the need, and later phases are planned with that experience. The bill of materials and supply lead times should also be part of the work plan.
7. Testing, commissioning and documentation
After installation, electrical measurements and tests are carried out, network connections are checked, and the readings from the meters are verified against measurements taken on site. The system is then commissioned after a joint check with your team.
At handover, ask for up-to-date electrical diagrams, panel and cable labels, a network diagram, a device list and the user accounts. A short training session for the team that will use the dashboards should also be part of the handover.
8. Plan for maintenance and growth from the start
Periodic checks, device and software updates, data backups and who responds when something fails should all be written down. When a new machine or line is added, adding a new measurement point should be easy: space in the panels, free ports in the racks and a monitoring system that can grow make this possible.
If the electrical, network and monitoring work will be split between different companies, the boundaries of responsibility and a shared work plan should be agreed in writing; the meter is in the panel, its data on the network and the result in the report, so these jobs depend on each other.
Velzon Bilişim delivers electrical installation and panels, network, server and security camera infrastructure, and IoT energy monitoring for factories and production facilities with a single team, from site survey to maintenance. See the industrial electrical, network and IoT service page for details.
Checklist
- The monitoring goals and the priority questions to be answered are written down.
- A site survey has been done; panels, cable routes, the existing network and site conditions are recorded.
- Measurement points and the space needed in the panels are defined.
- Authorized, qualified personnel and safety measures are planned for the electrical work.
- Production and office networks are separated; uninterruptible power, cooling and labeling are planned for the racks.
- It is clear where data is stored, for how long, and who sees what.
- Installation phases are matched to the production schedule.
- Up-to-date diagrams, labels and a device list are requested at handover; a maintenance plan is ready.